NVTA-Funded Projects
Legend
See mode types
Projects
FUNDEDNVTA Funding
ALLOCATEDRevenue Type
Local Distribution
(30%)
Regional
Revenue (70%)
Project Funding Sources
Project Status
NVTA Funding Status
Transportation Mode
Title | Regional Sponsor | Local Sponsor | Total Cost | Location(s) | Segment | Local Distribution Funds | Approved NVTA Amount (Regional) | Primary Mode | Current Status | Anticipated Completion Date | |
---|---|---|---|---|---|---|---|---|---|---|---|
Details | Silver/Blue Line Mitigation (4 New Buses) | Arlington County | N/A | $1,000,000 | Arlington County | 1 | N/A | $1,000,000 | Bus | Project Complete | December 31, 2014 |
Details | Boundary Channel Drive Interchange | Arlington County | N/A | $22,533,000 | Arlington County | 1 | N/A | $4,335,000 | Intersection/Interchange | Project Complete | May 31, 2024 |
Details | Crystal City Multimodal Center | Arlington County | N/A | $1,712,500 | Arlington County | 1 | N/A | $1,500,000 | Bus | Project Complete | December 31, 2018 |
Details | Ballston Metrorail Station West Entrance | Arlington County | Arlington County | $180,989,000 | Arlington County | 1 | $16,958 | $70,900,000 | Rail | Project Underway | June 30, 2027 |
Details | Lee Highway Corridor ITS Enhancements | Arlington County | N/A | $3,000,000 | Arlington County | 1 | N/A | $3,000,000 | Transportation Technology (e.g. ITS) | Project Underway | June 30, 2025 |
Details | Crystal City Streets: 12th Street transitway | Arlington County | N/A | $26,219,386 | Arlington County | 1 | N/A | $11,600,000 | Roadway | Project Underway | June 30, 2026 |
Details | Glebe Road Corridor ITS Improvements | Arlington County | N/A | $2,000,000 | Arlington County | 2 | N/A | $2,000,000 | Transportation Technology (e.g. ITS) | Project Underway | May 1, 2025 |
Details | Columbia Pike Multimodal Street Improvements | Arlington County | N/A | $133,000,000 | Arlington County | 1 | N/A | $12,000,000 | Roadway | Project Complete | November 2, 2022 |
Details | Columbia Pike Multimodal Street Improvements - East | Arlington County | N/A | $110,000,000 | Arlington County | 1 | N/A | $10,000,000 | Roadway | Project Underway | June 30, 2025 |
Details | ART Operations and Maintenance Facilities | Arlington County | Arlington County | $88,903,000 | Arlington County | 1 | $6,122,852 | $39,027,000 | Bus | Project Underway | June 30, 2025 |
Details | Crystal City Metrorail Station East Entrance and Intermodal Connections | Arlington County | Arlington County | $89,061,000 | Arlington County | 1 | $360,000 | $5,000,000 | Rail | Project Underway | June 30, 2025 |
Details | Pentagon City Multimodal Connections and Transitway Extension | Arlington County | N/A | $43,985,000 | Arlington County | 2 | N/A | $28,850,000 | Bus | Project Underway | April 30, 2025 |
Details | Intelligent Transportation System Improvements | Arlington County | N/A | $10,000,000 | Arlington County | 2 | N/A | $10,000,000 | Transportation Technology (e.g. ITS) | Project Underway | August 1, 2025 |
Details | Duke Street Transit Signal Priority Installation | City of Alexandria | N/A | $850,000 | City of Alexandria | 1 | N/A | $850,000 | Transportation Technology (e.g. ITS) | Project Complete | September 30, 2019 |
Details | DASH Bus Expansion (5 New) | City of Alexandria | N/A | $3,250,000 | City of Alexandria | 2 | N/A | $1,462,500 | Bus | Project Complete | March 31, 2016 |
Details | West End Transitway: Northern Segment (Phase 1) | City of Alexandria | N/A | $73,901,000 | City of Alexandria | 2 | N/A | $4,600,000 | Bus | Project Underway | August 30, 2027 |
Details | Shelters and Real Time Information for DASH/WMATA | City of Alexandria | N/A | $1,967,750 | City of Alexandria | 3 | N/A | $450,000 | Bus | Project Complete | December 31, 2018 |
Details | Potomac Yard Metrorail Station Development | City of Alexandria | N/A | $384,725,000 | City of Alexandria | 1 | N/A | $69,500,000 | Rail | Project Complete | November 30, 2023 |
Details | Alexandria ITS Projects | City of Alexandria | N/A | $1,195,491 | City of Alexandria | 3 | N/A | $1,195,491 | Transportation Technology (e.g. ITS) | Project Complete | November 30, 2020 |
Details | Alexandria Bus Network ITS | City of Alexandria | N/A | $150,000 | City of Alexandria | 3 | N/A | $150,000 | Transportation Technology (e.g. ITS) | Project Complete | September 30, 2020 |
Details | DASH Transit Service Enhancements and Expansion (including 8 electric buses) | City of Alexandria | City of Alexandria | $23,068,161 | City of Alexandria | 2 | $20,998,000 | $11,933,161 | Bus | Project Underway | December 31, 2027 |
Details | Alexandria Duke St Transitway | City of Alexandria | N/A | $114,800,000 | City of Alexandria | 2 | N/A | $87,000,000 | Bus | Project Underway | June 30, 2028 |
Details | Cue 35-Foot Buses (6 New) | City of Fairfax | N/A | $3,000,000 | City of Fairfax | 2 | N/A | $3,000,000 | Bus | Project Complete | September 30, 2015 |
Details | Kamp Washington Intersection Improvements | City of Fairfax | N/A | $11,587,950 | City of Fairfax | 2 | N/A | $1,000,000 | Intersection/Interchange | Project Complete | December 31, 2017 |
Details | Northfax - Intersection Improvements at Route 29/50 and Route 123 | City of Fairfax | N/A | $25,541,177 | City of Fairfax | 2 | N/A | $15,000,000 | Intersection/Interchange | Project Complete | June 30, 2019 |
Details | Jermantown / Route 50 Roadway Improvements | City of Fairfax | N/A | $6,925,139 | City of Fairfax | 2 | N/A | $1,000,000 | Intersection/Interchange | Project Complete | June 30, 2016 |
Details | Jermantown Road Corridor Improvements Project | City of Fairfax | City of Fairfax | $21,000,000 | City of Fairfax | 2 | $869,302 | $21,000,000 | Roadway | Project Underway | December 30, 2028 |
Details | Intersection Improvements at Eaton Place/Chain Bridge Road | City of Fairfax | City of Fairfax | $11,400,000 | City of Fairfax | 2 | $130,175 | $10,750,000 | Intersection/Interchange | Project Underway | December 30, 2028 |
Details | Blenheim Boulevard Multimodal Improvements (formerly, Old Lee Highway Multimodal Improvements) | City of Fairfax | N/A | $30,400,000 | City of Fairfax | 1 | N/A | $18,400,000 | Bike and Pedestrian | Project Underway | September 30, 2028 |
Details | Roadway Network Northfax West | City of Fairfax | N/A | $7,385,000 | City of Fairfax | 2 | N/A | $4,700,000 | Roadway | Project Underway | September 30, 2024 |
Details | Funding for Bus Shelters | City of Falls Church | N/A | $720,000 | City of Falls Church | 1 | N/A | $200,000 | Bus | Project Complete | June 30, 2017 |
Details | Pedestrian Access to Transit | City of Falls Church | N/A | $5,998,751 | City of Falls Church | 2 | N/A | $700,000 | Pedestrian only | Project Complete | June 30, 2018 |
Details | Pedestrian Bridge at Van Buren Street | City of Falls Church | City of Falls Church | $300,000 | City of Falls Church | 2 | $275,000 | $300,000 | Pedestrian only | Project Complete | March 31, 2017 |
Details | West Falls Church and Joint Campus Revitalization District Multimodal Transportation Project | City of Falls Church | N/A | $15,700,000 | City of Falls Church | 2 | N/A | $15,700,000 | Intersection/Interchange | Project Underway | May 30, 2025 |
Details | Route 28 Widening: Godwin Drive to the Southern City Limits | City of Manassas | City of Manassas | $20,711,401 | City of Manassas | 3 | $23,000 | $3,294,000 | Roadway | Project Complete | June 6, 2023 |
Details | Innovation Center Metrorail Station | Fairfax County | N/A | $89,000,000 | Fairfax County | 2 | N/A | $69,000,000 | Rail | Project Complete | December 31, 2020 |
Details | Connector Buses (12 New) | Fairfax County | N/A | $6,000,000 | Fairfax County | 1 | N/A | $6,000,000 | Bus | Project Complete | March 31, 2016 |
Details | West Ox Bus Garage Expansion | Fairfax County | N/A | $20,000,000 | Fairfax County | 2 | N/A | $20,000,000 | Bus | Project Complete | December 31, 2019 |
Details | Fairfax County Parkway Widening from Ox Rd to Lee Hwy | Fairfax County | Fairfax County | $321,286,500 | Fairfax County | 2 | $4,330,000 | $232,400,000 | Roadway | Project Underway | June 30, 2028 |
Details | Frontier Drive Extension & Interchange Improvements | Fairfax County | Fairfax County | $241,630,600 | Fairfax County | 1 | $3,000,000 | $138,957,472 | Roadway | Project Underway | June 30, 2033 |
Details | Route 28 Widening: Prince William County Line to Route 29 | Fairfax County | Fairfax County | $86,480,000 | Fairfax County | 3 | $8,580,443 | $26,000,000 | Roadway | Project Underway | April 30, 2025 |
Details | Rolling Road Widening - Old Keene Mill Road to Franconia Springfield Parkway | Fairfax County | N/A | $79,026,646 | Fairfax County | 1 | N/A | $43,811,000 | Roadway | Project Underway | December 31, 2027 |
Details | Route 1 Widening - Mount Vernon Memorial Highway to Napper Road | Fairfax County | N/A | $464,078,327 | Fairfax County | 1 | N/A | $308,595,000 | Roadway | Project Underway | December 31, 2032 |
Details | Route 7 Widening - Colvin Forest Drive to Jarrett Valley Drive | Fairfax County | Fairfax County | $313,871,738 | Fairfax County | 2 | $12,409,921 | $10,000,000 | Roadway | Project Complete | July 31, 2024 |
Details | Route 28 Widening 6 to 8 lanes (NB from McLearen Road to Dulles Toll Road) | Fairfax County | N/A | $13,300,000 | Fairfax County | 1 | N/A | $11,100,000 | Roadway | Project Complete | September 30, 2016 |
Details | Route 28 Widening 6 to 8 lanes (SB from Dulles Toll Road to Route 50) | Fairfax County | N/A | $22,200,000 | Fairfax County | 1 | N/A | $20,000,000 | Roadway | Project Complete | December 31, 2016 |
Details | Route 7 Bridge Widening: Over Dulles Toll Road | Fairfax County | N/A | $44,822,467 | Fairfax County | 1 | N/A | $13,900,000 | Roadway | Project Complete | June 30, 2017 |
Details | Rock Hill Road Bridge | Fairfax County | N/A | $100,000,000 | Fairfax County | 1 | N/A | $20,604,670 | Roadway | Not Yet Started | December 31, 2027 |
Details | Richmond Highway Bus Rapid Transit - Phases I & II | Fairfax County | Fairfax County | $730,000,000 | Fairfax County | 1 | $714,033 | $330,000,000 | Bus | Project Underway | December 31, 2033 |
Details | Richmond Highway (Route 1)/CSX Underpass Widening | Fairfax County | N/A | $56,000,000 | Fairfax County | 1 | N/A | $12,000,000 | Roadway | Not Yet Started | December 31, 2027 |
Details | Leesburg Park and Ride | Loudoun County | N/A | $4,760,660 | Loudoun County | 1 | N/A | $1,000,000 | Park and Ride | Project Complete | March 31, 2019 |
Details | Transit Buses (2 New) | Loudoun County | N/A | $880,000 | Loudoun County | 3 | N/A | $880,000 | Bus | Project Complete | December 31, 2013 |
Details | Transit Buses (4 New) | Loudoun County | N/A | $1,860,000 | Loudoun County | 3 | N/A | $1,860,000 | Bus | Project Complete | March 31, 2017 |
Details | Loudoun County Parkway Development | Loudoun County | N/A | $51,000,000 | Loudoun County | 1 | N/A | $31,000,000 | Roadway | Project Complete | October 30, 2023 |
Details | Belmont Ridge Road, North of the Dulles Greenway | Loudoun County | Loudoun County | $56,805,386 | Loudoun County | 2 | $10,805,386 | $20,000,000 | Roadway | Project Complete | September 30, 2016 |
Details | Belmont Ridge Road Widening (Truro Parish Dr to Croson Ln) | Loudoun County | N/A | $42,736,000 | Loudoun County | 2 | N/A | $19,500,000 | Roadway | Project Complete | December 31, 2024 |
Details | Route 28 Northbound Widening – between Dulles Toll Road and Sterling Boulevard | Loudoun County | N/A | $20,000,000 | Loudoun County | 2 | N/A | $20,000,000 | Roadway | Project Complete | June 15, 2020 |
Details | Route 15 Bypass Widening: Battlefield Parkway to Montresor Road | Loudoun County | N/A | $113,486,000 | Loudoun County | 1 | N/A | $54,000,000 | Roadway | Project Underway | June 30, 2029 |
Details | Extend Shellhorn Road: Loudoun County Parkway (Route 607) to Randolph Drive (Route 1072) | Loudoun County | N/A | $180,106,309 | Loudoun County | 2 | N/A | $16,000,000 | Roadway | Project Underway | October 27, 2029 |
Details | Northstar Boulevard - Evergreen Mills Road (formerly, Shreveport Drive) to Tall Cedars Parkway | Loudoun County | Loudoun County | $132,289,000 | Loudoun County | 1 | $15,997,922 | $64,805,000 | Roadway | Project Underway | December 16, 2024 |
Details | Prentice Drive Extension: Lockridge Road (Route 789) to Shellhorn Road (Route 643) | Loudoun County | Loudoun County | $95,087,144 | Loudoun County | 2 | $7,319,000 | $76,230,000 | Roadway | Project Underway | December 1, 2029 |
Details | Dulles West Boulevard Widening: Loudoun County Parkway to Northstar Boulevard | Loudoun County | N/A | $78,729,000 | Loudoun County | 2 | N/A | $47,800,000 | Roadway | Project Underway | June 30, 2027 |
Details | Route 9 Traffic Calming | Loudoun County | Loudoun County | $19,869,943 | Loudoun County | 1 | $3,361,000 | $12,112,000 | Intersection/Interchange | Project Complete | April 30, 2021 |
Details | Evergreen Mills Road Intersection Realignments – Watson Road and Reservoir Road | Loudoun County | Loudoun County | $14,000,000 | Loudoun County | 3 | $617,000 | $14,000,000 | Intersection/Interchange | Project Underway | June 2, 2028 |
Details | Transit Alternatives Analysis Study in the Route 7 Corridor | NVTC | City of Falls Church | $838,000 | Arlington County, City of Alexandria, City of Falls Church, Fairfax County | 1 | $102,800 | $838,000 | Bus | Project Underway | August 31, 2026 |
Details | Route 28 Widening: Route 234 Bypass to Linton Hall Road | Prince William County | Prince William County | $30,150,000 | Prince William County | 3 | $1,500,000 | $69,700,000 | Roadway | Project Complete | December 30, 2022 |
Details | Route 1 Widening: Featherstone Road to Marys Way | Prince William County | N/A | $111,968,174 | Prince William County | 2 | N/A | $63,400,000 | Roadway | Project Underway | October 26, 2023 |
Details | Route 28 Corridor Roadway Improvements - East of Route 234 | Prince William County | N/A | $292,400,000 | Prince William County | 1 | N/A | $95,000,000 | Roadway | Project Underway | October 31, 2028 |
Details | Construct Interchange at Prince William Parkway and Clover Hill Road | Prince William County | N/A | $12,900,000 | Prince William County | 1 | N/A | $1,900,000 | Intersection/Interchange | Project Underway | May 31, 2026 |
Details | Construct Interchange at Prince William Parkway and University Boulevard | Prince William County | Prince William County | $24,200,000 | Prince William County | 2 | $5,513,000 | $24,200,000 | Intersection/Interchange | Project Underway | May 30, 2024 |
Details | Construct Interchange at Route 234 and Brentsville Road | Prince William County | N/A | $54,900,000 | Prince William County | 1 | N/A | $54,900,000 | Intersection/Interchange | Project Complete | August 31, 2024 |
Details | Summit School Rd Extension and Telegraph Rd Widening | Prince William County | Prince William County | $36,640,980 | Prince William County | 2 | $3,000,000 | $35,000,000 | Roadway | Project Underway | April 30, 2026 |
Details | PRTC New Gainesville Service (1 New Bus) | PRTC | N/A | $580,000 | Prince William County | 3 | N/A | $580,000 | Bus | Project Complete | September 30, 2014 |
Details | Western Bus Maintenance & Storage Facility | PRTC | N/A | $47,680,000 | Prince William County | 1 | N/A | $16,500,000 | Bus | Project Complete | September 30, 2020 |
Details | Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road | Prince William County | Prince William County | $180,085,000 | Town of Dumfries | 1 | $1,500,000 | $129,760,000 | Roadway | Project Underway | February 28, 2026 |
Details | Herndon Metrorail Intermodal Access improvements | Town of Herndon | Town of Herndon | $5,862,061 | Town of Herndon | 1 | $1,125,000 | $1,100,000 | Bike and Pedestrian | Project Complete | July 31, 2023 |
Details | Herndon Parkway Intersection Improvements at Van Buren St | Town of Herndon | Town of Herndon | $3,110,000 | Town of Herndon | 1 | $1,000,000 | $500,000 | Intersection/Interchange | Project Complete | September 7, 2023 |
Details | Herndon Parkway Intersection Improvements at Sterling Rd | Town of Herndon | N/A | $500,000 | Town of Herndon | 1 | N/A | $500,000 | Intersection/Interchange | Project Complete | March 31, 2019 |
Details | East Elden Street Improvements & Widening | Town of Herndon | N/A | $55,342,000 | Town of Herndon | 2 | N/A | $10,400,000 | Roadway | Project Underway | September 30, 2026 |
Details | Interchange Improvements at Route 15 Leesburg Bypass and Edwards Ferry Road | Town of Leesburg | Town of Leesburg | $185,074,950 | Town of Leesburg | 2 | $26,800 | $7,400,000 | Intersection/Interchange | Project Underway | December 31, 2030 |
Details | Route 7 (East Market Street)/Battlefield Parkway Interchange | Town of Leesburg | N/A | $77,288,540 | Town of Leesburg | 2 | N/A | $58,000,000 | Intersection/Interchange | Project Complete | November 18, 2021 |
Details | Construct Interchange at Route 15 Bypass and Battlefield Parkway | Town of Leesburg | N/A | $60,000,000 | Town of Leesburg | 1 | N/A | $2,000,000 | Intersection/Interchange | Project Underway | December 31, 2030 |
Details | Vienna-Carter Library Parking Garage (formerly, Mill St NE Parking Garage) | Town of Vienna | N/A | $4,600,000 | Town of Vienna | 2 | N/A | $2,300,000 | Park and Ride | Project Underway | February 28, 2026 |
Details | VRE Lorton Station Second Platform | VRE | N/A | $16,150,000 | Fairfax County | 1 | N/A | $800,270 | Rail | Project Complete | December 31, 2030 |
Details | Franconia-Springfield Platform Improvements | VRE | N/A | $13,000,000 | Fairfax County | 1 | N/A | $13,000,000 | Rail | Project Underway | December 30, 2025 |
Details | Rippon Station Expansion and Second Platform | VRE | N/A | $16,634,793 | Prince William County | 1 | N/A | $39,482 | Rail | Project Underway | December 31, 2030 |
Details | Slaters Lane Rail Crossover | VRE | N/A | $7,000,000 | City of Alexandria | 1 | N/A | $7,000,000 | Rail | Project Complete | September 18, 2020 |
Details | VRE Crystal City Station Improvements | VRE | N/A | $48,530,000 | Arlington County | 1 | N/A | $20,200,000 | Rail | Project Underway | June 30, 2028 |
Details | Manassas Park Station Parking Expansion | VRE | N/A | $30,433,503 | City of Manassas Park | 2 | N/A | $2,500,000 | Park and Ride | Project Underway | March 31, 2026 |
Details | VRE Gainesville-Haymarket Extension/Broad Run Expansion Project Development | VRE | N/A | $5,145,943 | Prince William County | 3 | N/A | $1,500,000 | Rail | Project Underway | February 28, 2027 |
Details | Blue Line Traction Power Upgrades | WMATA | N/A | $60,246,046 | Arlington County, City of Alexandria, Fairfax County | 2 | N/A | $17,443,951 | Rail | Project Complete | December 31, 2023 |
Details | Traction Power Upgrades on the Orange Line in Virginia | WMATA | N/A | $17,736,012 | Arlington County, City of Fairfax, City of Falls Church, Fairfax County | 2 | N/A | $4,978,685 | Rail | Project Complete | July 30, 2020 |
Details | Falls Church Enhanced Regional Bike Routes (W&OD) | City of Falls Church | N/A | $3,244,959 | City of Falls Church | 2 | N/A | $3,244,959 | Bike and Pedestrian | Project Complete | December 31, 2021 |
Details | Construct Crosstrail Boulevard (Route 653): Sycolin Road to Dulles Greenway (Route 267) | Loudoun County | N/A | $122,023,000 | Loudoun County | 1 | N/A | $36,700,000 | Roadway | Project Underway | January 3, 2028 |
Details | Evergreen Mills Road Widening from Northstar Boulevard to Stone Springs Boulevard | Loudoun County | N/A | $35,500,000 | Loudoun County | 1 | N/A | $18,000,000 | Roadway | Not Yet Started | June 30, 2027 |
Details | Route 234 and Sudley Manor Drive Interchange | Prince William County | N/A | $115,000,000 | Prince William County | 1 | N/A | $115,000,000 | Intersection/Interchange | Project Underway | June 30, 2032 |
Details | Government Center Parkway Extension | City of Fairfax | City of Fairfax | $9,482,241 | City of Fairfax | 1 | $12,715 | $3,540,000 | Roadway | Project Underway | March 30, 2026 |
Details | Jermantown Road/Route 29 Intersection Improvements | City of Fairfax | N/A | $1,259,000 | City of Fairfax | 1 | N/A | $700,000 | Intersection/Interchange | Project Underway | December 30, 2028 |
Details | University Boulevard Extension: Devlin Road to Wellington Road | Prince William County | Prince William County | $100,000,000 | Prince William County | 2 | $4,927,118 | $53,000,000 | Roadway | Project Underway | June 30, 2027 |
Details | North Woodbridge Mobility Improvements: Annapolis Way Connector | Prince William County | N/A | $8,300,000 | Prince William County | 1 | N/A | $8,000,000 | Roadway | Project Underway | March 30, 2025 |
Details | Van Buren Road North Extension: Route 234 to Cardinal Drive | Prince William County | Prince William County | $82,000,000 | Prince William County | 2 | $1,552,950 | $8,000,000 | Roadway | Project Underway | June 30, 2030 |
Details | Soapstone Drive Extension from Sunset Hills Road to Sunrise Valley Drive | Fairfax County | Fairfax County | $235,000,000 | Fairfax County | 1 | $8,458,339 | $88,793,037 | Roadway | Project Underway | April 30, 2026 |
Details | Seven Corners Ring Road Improvements | Fairfax County | Fairfax County | $132,690,417 | Fairfax County | 2 | $196,604 | $126,429,417 | Intersection/Interchange | Not Yet Started | June 30, 2032 |
Details | Downtown Falls Church Multimodal Improvements | City of Falls Church | City of Falls Church | $10,540,000 | City of Falls Church | 2 | $410,000 | $8,300,000 | Bike and Pedestrian | Project Underway | June 30, 2026 |
Details | CC2DCA Multimodal Connection (formerly known as CC2DCA Intermodal Connector) | Arlington County | N/A | $57,200,000 | Arlington County | 1 | N/A | $39,100,000 | Bike and Pedestrian | Project Underway | June 30, 2029 |
Details | Rosslyn Multimodal Network Improvements | Arlington County | N/A | $18,374,000 | Arlington County | 1 | N/A | $11,874,000 | Bike and Pedestrian | Project Underway | June 30, 2026 |
Details | West Falls Church Access to Transit and Multimodal Connectivity | City of Falls Church | N/A | $6,900,000 | City of Falls Church | 2 | N/A | $6,900,000 | Bike and Pedestrian | Project Underway | September 30, 2026 |
Details | Franconia-Springfield Passenger Rail Bypass | Virginia Passenger Rail Authority | N/A | $334,223,132 | Fairfax County | 1 | N/A | $22,958,821 | Rail | Project Underway | December 31, 2026 |
Details | Route 28 Hot Spot Improvements (Sterling Boulevard to the Dulles Toll Road) | Loudoun County | N/A | $12,400,000 | Loudoun County | 3 | N/A | $12,400,000 | Roadway | Project Complete | November 30, 2017 |
Details | Liberia Avenue 3rd Lane Eastbound | City of Manassas | N/A | $8,851,639 | City of Manassas | 1 | N/A | $8,851,639 | Roadway | Not Yet Started | June 30, 2030 |
Details | Northern Virginia ITS/ICM Improvements | Loudoun County | N/A | $3,777,000 | Loudoun County | 2 | N/A | $2,500,000 | Transportation Technology (e.g. ITS) | Project Underway | July 1, 2026 |
Details | Ryan Road Widening (Phase 2) | Loudoun County | Loudoun County | $31,500,000 | Loudoun County | 1 | $138,000 | $16,000,000 | Roadway | Not Yet Started | September 29, 2028 |
Details | Route 7 Improvements | Loudoun County | Loudoun County | $130,992,500 | Loudoun County | 2 | $3,607,000 | $20,000,000 | Roadway | Not Yet Started | September 26, 2030 |
Details | North Washington Street Multimodal Improvements Project | City of Falls Church | City of Falls Church | $22,500,000 | City of Falls Church | 2 | $1,145,000 | $22,500,000 | Bike and Pedestrian | Not Yet Started | June 30, 2030 |
Details | Herndon Parkway Improvements at Worldgate Drive Extension | Town of Herndon | Town of Herndon | $6,536,000 | Town of Herndon | 2 | $300,000 | $4,581,000 | Intersection/Interchange | Not Yet Started | June 30, 2030 |
Details | Route 1 at Route 123 Interchange | Prince William County | N/A | $68,000,000 | Prince William County | 1 | N/A | $3,000,000 | Intersection/Interchange | Not Yet Started | June 30, 2030 |
Details | Connector Buses (8 New) - Fairfax Connector Buses for Tysons to Franconia Service | Fairfax County | N/A | $10,000,000 | Fairfax County | 3 | N/A | $10,000,000 | Bus | Not Yet Started | June 30, 2027 |
Details | Old Bridge Road Widening: Colby Drive to Minnieville Road | Prince William County | N/A | $25,000,000 | Prince William County | 1 | N/A | $25,000,000 | Roadway | Not Yet Started | June 30, 2030 |
Details | West End Transitway Phase 1b: South Van Dorn Street and Bridge Design | City of Alexandria | N/A | $15,070,000 | City of Alexandria | 1 | N/A | $15,000,000 | Bus | Project Underway | June 30, 2030 |
Details | Alexandria Bike and Pedestrian Trails Construction and Reconstruction: Holmes Run Trail | City of Alexandria | N/A | $5,500,000 | City of Alexandria | 1 | N/A | $5,000,000 | Bike and Pedestrian | Project Underway | June 30, 2027 |
Details | Loudoun County Parkway Interchange at US 50 | Loudoun County | Loudoun County | $181,152,680 | Loudoun County | 1 | $500,000 | $35,250,000 | Intersection/Interchange | Project Underway | April 12, 2033 |
Details | City of Falls Church Signal Prioritization Project | City of Falls Church | N/A | $1,400,000 | City of Falls Church | 2 | N/A | $1,400,000 | Transportation Technology (e.g. ITS) | Not Yet Started | June 30, 2029 |
Details | Roundabout at Route 28 and Sudley Rd | City of Manassas | City of Manassas | $5,495,000 | City of Manassas | 1 | $1,050,000 | $4,020,000 | Intersection/Interchange | Project Underway | June 1, 2027 |
Details | Old Ox Road Widening - Shaw Road to Oakgrove Road | Loudoun County | N/A | $49,350,000 | Loudoun County | 1 | N/A | $30,000,000 | Roadway | Not Yet Started | October 14, 2031 |
Details | Shirlington Bus Station Expansion | Arlington County | N/A | $11,800,000 | Arlington County | 1 | N/A | $11,600,000 | Bus | Not Yet Started | June 30, 2031 |
Details | Sycolin Road Widening - Loudoun Center Place to Crosstrail Boulevard | Loudoun County | N/A | $32,861,000 | Loudoun County | 2 | N/A | $15,000,000 | Roadway | Not Yet Started | March 24, 2031 |
Details | Route 15 at Braddock Road Roundabout | Loudoun County | N/A | $25,655,000 | Loudoun County | 2 | N/A | $10,000,000 | Intersection/Interchange | Not Yet Started | August 17, 2031 |
Details | Route 234 Bicycle and Pedestrian Facility Over I-95 | Prince William County | N/A | $12,000,000 | Prince William County | 1 | N/A | $12,000,000 | Bike and Pedestrian | Not Yet Started | June 28, 2030 |
Details | Route 7 Multimodal Improvements (I-495 to I-66) | Fairfax County | N/A | $244,407,921 | Fairfax County | 2 | N/A | $101,351,506 | Roadway | Not Yet Started | June 30, 2031 |
Details | Braddock Road Multimodal Improvements Phase II (Humphries Drive to Southampton Drive) | Fairfax County | Fairfax County | $95,286,334 | Fairfax County | 3 | $5,400,000 | $27,299,000 | Intersection/Interchange | Not Yet Started | June 30, 2031 |
Details | Northfax Network Improvements - Northfax East-West Road | City of Fairfax | City of Fairfax | $18,332,754 | City of Fairfax | 2 | $21,712 | $12,932,754 | Roadway | Not Yet Started | June 30, 2033 |
Details | Route 234 Operational Improvements | Prince William County | N/A | $10,000,000 | Prince William County | 1 | N/A | $10,000,000 | Transportation Technology (e.g. ITS) | Not Yet Started | June 30, 2029 |
Details | The Landing at Prince William Transit Center | Prince William County | N/A | $25,000,000 | Prince William County | 1 | N/A | $25,000,000 | Bus | Not Yet Started | June 30, 2032 |
Details | Triangle Mobility Hub and First/Last Mile Connection Improvements | Prince William County | N/A | $10,000,000 | Town of Dumfries | 1 | N/A | $10,000,000 | Bus | Not Yet Started | June 30, 2030 |
Details | VRE Backlick Road Station Improvements | VRE | N/A | $8,645,103 | Fairfax County | 1 | N/A | $6,145,103 | Rail | Not Yet Started | June 30, 2029 |
Details | Safety Improvements at High-Crash Intersections | City of Alexandria | City of Alexandria | $20,500,000 | City of Alexandria | 2 | $200,000 | $3,000,000 | Bike and Pedestrian | Not Yet Started | December 31, 2032 |
Details | Alexandria Metroway Enhancements | City of Alexandria | N/A | $14,924,792 | City of Alexandria | 1 | N/A | $7,000,000 | Bus | Not Yet Started | June 30, 2030 |
Details | Smart & Connected Vehicle Infrastructure | City of Alexandria | N/A | $5,050,000 | City of Alexandria | 1 | N/A | $5,000,000 | Transportation Technology (e.g. ITS) | Not Yet Started | June 30, 2031 |
Details | Route 28-Centreville Road Corridor Improvements | City of Manassas Park | N/A | $40,000,000 | Prince William County | 1 | N/A | $40,000,000 | Intersection/Interchange | Not Yet Started | June 30, 2032 |
Details | Capital Bikeshare (multiple locations) | Arlington County | Arlington County | N/A | Arlington County | 0 | $13,953,938 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Transit Operations (incremental cost for new routes) | Arlington County | Arlington County | N/A | Arlington County | 0 | $8,512,373 | N/A | Bus | Project Underway | N/A |
Details | Improvements Outside Major Corridors (multiple locations) | Arlington County | Arlington County | N/A | Arlington County | 0 | $9,206,549 | N/A | Roadway | Project Underway | N/A |
Details | Bus Stops and Shelters, including accessibility improvements (multiple locations) | Arlington County | Arlington County | N/A | Arlington County | 0 | $2,234,433 | N/A | Bus | Project Underway | N/A |
Details | Intelligent Transportation Systems (includes TMC and CCTV upgrades) | Arlington County | Arlington County | N/A | Arlington County | 0 | $5,390,113 | N/A | Transportation Technology (e.g. ITS) | Project Underway | N/A |
Details | Traffic Counts (multiple locations) | Arlington County | Arlington County | N/A | Arlington County | 0 | $1,359,287 | N/A | Roadway | Project Underway | N/A |
Details | Transit Strategic Plan & ART Asset Management Plan | Arlington County | Arlington County | N/A | Arlington County | 0 | $629,911 | N/A | Bus | Project Underway | N/A |
Details | Project Development (formerly Program Administration) | Arlington County | Arlington County | N/A | Arlington County | 0 | $2,457,261 | N/A | Other | Project Underway | N/A |
Details | Traffic Signal Rebuilds, Infrastructure Upgrades, Facilities (multiple locations) | Arlington County | Arlington County | N/A | Arlington County | 0 | $4,353,572 | N/A | Transportation Technology (e.g. ITS) | Project Underway | N/A |
Details | ART Bus Procurement | Arlington County | Arlington County | N/A | Arlington County | 0 | $6,874,706 | N/A | Bus | Project Underway | N/A |
Details | Arlington Blvd Intersections (multiple locations) | Arlington County | Arlington County | N/A | Arlington County | 0 | $387,783 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Court House Metrorail Station Second Elevator | Arlington County | Arlington County | N/A | Arlington County | 0 | $60,894 | N/A | Rail | Project Underway | N/A |
Details | STAR Call Center Office Space | Arlington County | Arlington County | N/A | Arlington County | 0 | $187,045 | N/A | Other | Project Complete | N/A |
Details | Bus Bay Expansion - East Falls Church Metro Station | Arlington County | Arlington County | N/A | Arlington County | 0 | $384,063 | N/A | Bus | Project Underway | N/A |
Details | Bicycle and Pedestrian Facilities | Arlington County | Arlington County | N/A | Arlington County | 0 | $2,529,307 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Carlin Springs Road Bridge over George Mason Drive (Replacement) | Arlington County | Arlington County | N/A | Arlington County | 0 | $526,800 | N/A | Roadway | Project Complete | N/A |
Details | Transit ITS and Planning (Includes TSP) | Arlington County | Arlington County | N/A | Arlington County | 0 | $3,161,254 | N/A | Transportation Technology (e.g. ITS) | Project Underway | N/A |
Details | Transportation Demand Management | Arlington County | Arlington County | N/A | Arlington County | 0 | $653,368 | N/A | Other | Project Underway | N/A |
Details | Ballston Multimodal Improvements | Arlington County | Arlington County | N/A | Arlington County | 0 | $650,270 | N/A | Bus | Project Complete | N/A |
Details | Arlington Blvd/Washington Blvd Interchange | Arlington County | Arlington County | N/A | Arlington County | 0 | $100,294 | N/A | Roadway | Project Underway | N/A |
Details | Traffic Signal Optimization | Arlington County | Arlington County | N/A | Arlington County | 0 | $50,247 | N/A | Transportation Technology (e.g. ITS) | Project Underway | N/A |
Details | Safety Improvements | Arlington County | Arlington County | N/A | Arlington County | 0 | $165,387 | N/A | Roadway | Project Underway | N/A |
Details | Strategic Network Analysis and Planning | Arlington County | Arlington County | N/A | Arlington County | 0 | $525,423 | N/A | Other | Project Underway | N/A |
Details | Balls Hill Road & Old Dominion Drive | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $5,065,084 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Braddock Road Multimodal Study | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $1,622,687 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Fairfax Corner Parking Facility | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $9,220 | N/A | Other | Project Complete | N/A |
Details | Fairfax Connector Service | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $99,577,541 | N/A | Bus | Project Complete | N/A |
Details | I-66/ Random Hills Road | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $273,127 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Route 1 Study (Pohick to Occoquan) | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $651,424 | N/A | Bus | Project Complete | N/A |
Details | Shirley Gate Road from Braddock to Fairfax County Pkwy | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $1,431,449 | N/A | Roadway | Project Underway | N/A |
Details | Silverline Metrorail Ph II NVTA 30% | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $40,250,000 | N/A | Rail | Project Complete | N/A |
Details | Telegraph Road Walkway | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $3,989 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Town Center Parkway DTR Underpass Rail Support | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $8,659,067 | N/A | Roadway | Project Complete | N/A |
Details | Tysons Projects (Boone Blvd/Gosnell Feasibility Study) | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $87,319 | N/A | Roadway | Project Complete | N/A |
Details | Vienna Metro Bike/Ped Interim Imprv | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $300,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Active Transportation Wayfind signage | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $51,056 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Spot Roadway Program (6 individual projects) | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $8,019,013 | N/A | Other | Project Underway | N/A |
Details | Traffic Studies/Planning (18 individual projects) | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $5,166,450 | N/A | Other | Project Underway | N/A |
Details | Various Project Implementation Works | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $20,350,688 | N/A | Other | Project Underway | N/A |
Details | WMATA Capital Funding | Fairfax County | Fairfax County | N/A | Fairfax County | 0 | $81,121,640 | N/A | Rail | Project Underway | N/A |
Details | Sterling Blvd Extended (Pacific Blvd to Moran Rd) | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $12,315,652 | N/A | Roadway | Project Underway | N/A |
Details | Riverside Pkwy (Lexington Dr to Loudoun County Pkwy) | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $6,000,000 | N/A | Roadway | Project Complete | N/A |
Details | Contingency - Sidewalks (Countywide) | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $1,279,759 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Northstar / Belmont Ridge Rd Traffic Signal | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $620,000 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Contingency - Traffic Signal (Countywide) | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $18,991 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Mooreview Pkwy (Croson to Old Ryan Rd) | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $324,608 | N/A | Roadway | Project Complete | N/A |
Details | Contingency - Traffic Calming (Countywide) | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $48,453 | N/A | Roadway | Project Complete | N/A |
Details | Farmwell Rd (Smith Switch to Ashburn Rd) | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $3,500,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Northstar Blvd 79 (Route 50 to Tall Cedar) | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $7,350,000 | N/A | Roadway | Project Complete | N/A |
Details | Project Management Consulting Services | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $238,750 | N/A | Other | Project Underway | N/A |
Details | Braddock Riding Center Drive Signal | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $45,367 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Woodgrove & Fields Farm Road | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $77,488 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Belmont Ridge Road South | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $2,400,000 | N/A | Roadway | Project Underway | N/A |
Details | Marblehead Drive & Gloucester Traffic Study | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $33,445 | N/A | Other | Project Complete | N/A |
Details | Crosstrail Phase A2 Claudia Dr & Sycolin Road | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $1,594,493 | N/A | Roadway | Project Complete | N/A |
Details | Loudoun County Parkway and Beaumeade Circle Signal | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $457,912 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Oak Grove Road Route 824 | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $60,000 | N/A | Roadway | Project Complete | N/A |
Details | Route 9 & Route 287 Roundabout | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $1,213,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Shaw Road Improvements | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $322,339 | N/A | Roadway | Project Complete | N/A |
Details | Braddock Summerall Supreme | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $2,421,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Edgewater Street Sidewalk | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $135,822 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Montresor Road Sidewalk | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $255,200 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | West Poplar Road Traffic Study | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $38,420 | N/A | Other | Project Complete | N/A |
Details | Traffic Calming Signs | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $54,256 | N/A | Roadway | Project Underway | N/A |
Details | Moorefield Parkway to Moorefield Station | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $2,624,078 | N/A | Roadway | Project Underway | N/A |
Details | Westwind Drive State St to Ladbrook Drive | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $3,064,125 | N/A | Roadway | Project Underway | N/A |
Details | Leesburg Tuscarora Creek Trail | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $1,800,000 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Route 7 & Route 690 Interchange | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $3,845,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Crosstrail Phase B | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $1,490,000 | N/A | Roadway | Project Complete | N/A |
Details | Sterling Sidewalks | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $9,956 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | River Creek Sidewalks | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $23,305 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Broadlands Blvd Sidewalk | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $3,278 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | LC Parkway Dulles Landing to Route 50 | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $673,687 | N/A | Roadway | Project Underway | N/A |
Details | Belmont Ridge Road & Freedom Trail Sidewalk | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $12,271 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | W&OD Crossing Improvements | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $934,500 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Leesburg Bus Shelters | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $238,200 | N/A | Bus | Project Underway | N/A |
Details | Metro Capital Contribution | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $22,135,187 | N/A | Rail | Project Underway | N/A |
Details | Route 7 – Blue Ridge Mountain / Raven Rocks Intersection | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $35,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Route 15 Improvements, Phase 2: Montresor to Point of Rocks, Segment 2 | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $61,000 | N/A | Roadway | Project Underway | N/A |
Details | Route 7 Pedestrian Improvements | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $2,725 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Sidewalk and Trail Program | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $6,065,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Ashbrook Pl & Atwater Drive Intersection | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $3,902 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Harmony School Sidewalk | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $2,183,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Enterprise Steet Crosswalk | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $294,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Route 7 Shared Use Path | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $668,275 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Farebox Replacement | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $1,472,132 | N/A | Bus | Project Underway | N/A |
Details | Bus Stops for new Routes | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $1,000,000 | N/A | Bus | Project Underway | N/A |
Details | Bus Shelters and Benches | Loudoun County | Loudoun County | N/A | Loudoun County | 0 | $1,350,700 | N/A | Bus | Project Underway | N/A |
Details | Fuller Road Improvements | Prince William County | Prince William County | N/A | Prince William County | 0 | $2,000,000 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Minnieville Road (Spriggs Rd to Route 234) | Prince William County | Prince William County | N/A | Prince William County | 0 | $19,450,000 | N/A | Roadway | Project Complete | N/A |
Details | Neabsco Mills Road Widening (Route 1 to Smoke Court) | Prince William County | Prince William County | N/A | Prince William County | 0 | $8,996,659 | N/A | Roadway | Project Complete | N/A |
Details | Virginia Railway Express (VRE) Subsidy | Prince William County | Prince William County | N/A | Prince William County | 0 | $50,642,486 | N/A | Rail | Project Underway | N/A |
Details | Prince William Parkway (Old Bridge Rd to Minnieville Rd) | Prince William County | Prince William County | N/A | Prince William County | 0 | $1,467,368 | N/A | Roadway | Project Complete | N/A |
Details | Potomac and Rappahannock Transportation Commission (PRTC) Subsidy | Prince William County | Prince William County | N/A | Prince William County | 0 | $167,587 | N/A | Bus | Project Underway | N/A |
Details | University Blvd Extension (Sudley Manor Dr to Edmonston Dr) | Prince William County | Prince William County | N/A | Prince William County | 0 | $9,701,810 | N/A | Roadway | Project Complete | N/A |
Details | Telegraph Road (Horner) Traffic Signal Project | Prince William County | Prince William County | N/A | Prince William County | 0 | $650,000 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Dumfries Road Shared Use Path/Trail (Country Club Drive to Exeter Drive) | Prince William County | Prince William County | N/A | Prince William County | 0 | $91,552 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Potomac and Neabsco Parking Garage | Prince William County | Prince William County | N/A | Prince William County | 0 | $5,280,000 | N/A | Park and Ride | Project Complete | N/A |
Details | Old Bridge Road at Gordon Boulevard (Route 123) Intersection Improvements | Prince William County | Prince William County | N/A | Prince William County | 0 | $1,736,228 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Devlin Road Widening (Linton Hall Rd to Wellington Rd) | Prince William County | Prince William County | N/A | Prince William County | 0 | $4,000,000 | N/A | Roadway | Project Underway | N/A |
Details | Minnieville Road/Prince William Parkway Interchange | Prince William County | Prince William County | N/A | Prince William County | 0 | $80,000,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Transportation & Roadway Improvement Program | Prince William County | Prince William County | N/A | Prince William County | 0 | $2,106,272 | N/A | Other | Project Underway | N/A |
Details | North Woodbridge Mobility Improvements (Marina Way) | Prince William County | Prince William County | N/A | Prince William County | 0 | $50,000 | N/A | Roadway | Project Underway | N/A |
Details | North Woodbridge Pedestrian Bridge | Prince William County | Prince William County | N/A | Prince William County | 0 | $1,000,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Talon Median Extension | Prince William County | Prince William County | N/A | Prince William County | 0 | $130,000 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Old Bridge Road- Occoquan Road Interchange | Prince William County | Prince William County | N/A | Prince William County | 0 | $90,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Rollins Ford Rd Roundabout | Prince William County | Prince William County | N/A | Prince William County | 0 | $145,000 | N/A | Roadway | Project Underway | N/A |
Details | Kerill Road Raised Crosswalk | Prince William County | Prince William County | N/A | Prince William County | 0 | $25,000 | N/A | Pedestrian only | Project Complete | N/A |
Details | Route 1: Neabsco to Featherstone | Prince William County | Prince William County | N/A | Prince William County | 0 | $361,976 | N/A | Roadway | Project Complete | N/A |
Details | WMATA Capital Contribution | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $19,801,911 | N/A | Rail | Project Underway | N/A |
Details | Additional WMATA Subsidy (Base Ops) | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $4,256,000 | N/A | Rail | Project Complete | N/A |
Details | Bus Shelters and Benches | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $519,227 | N/A | Bus | Project Underway | N/A |
Details | Seminary Rd at Beauregard St Ellipse | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $325,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Route 1 at E Reed Intersection Improvements | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $350,000 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Cameron & Prince Pedestrian and Bicycle Facilities | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $241,331 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Access to Transit - City Sidewalk Connections | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $60,000 | N/A | Pedestrian only | Project Complete | N/A |
Details | WMATA Operating Subsidy | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $14,185,417 | N/A | Rail | Project Underway | N/A |
Details | I-395 Ramp at Duke Street/Landmark Mall | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $1,250,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Transit Staffing Contingency | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $300,000 | N/A | Bus | Project Underway | N/A |
Details | DASH Service Operations & Expansion | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $615,000 | N/A | Bus | Project Underway | N/A |
Details | DASH Technologies | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $150,000 | N/A | Bus | Project Underway | N/A |
Details | Transit Strategic Plan | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $133,669 | N/A | Bus | Project Underway | N/A |
Details | Envision Route 7 | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $58,669 | N/A | Bus | Project Underway | N/A |
Details | Transit Access & Amenities | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $160,000 | N/A | Bus | Project Underway | N/A |
Details | Landmark Transit Center | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $256,000 | N/A | Bus | Project Underway | N/A |
Details | Transit Signal Priority | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $60,000 | N/A | Transportation Technology (e.g. ITS) | Project Underway | N/A |
Details | Duke Street at Route 1 Safety Improvements | City of Alexandria | City of Alexandria | N/A | City of Alexandria | 0 | $500,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | CUE Operations | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $20,633,585 | N/A | Bus | Project Underway | N/A |
Details | Traffic Signal Preemption | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $405,060 | N/A | Transportation Technology (e.g. ITS) | Project Complete | N/A |
Details | Roadbed Reconstruction (Route 50 Kamp Washington to Fairchester Dr) | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $430,306 | N/A | Roadway | Project Complete | N/A |
Details | George Snyder Trail | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $93,329 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Emergency Power Battery Backup | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $93,067 | N/A | Transportation Technology (e.g. ITS) | Project Complete | N/A |
Details | Old Town Sidewalk Spot Widening | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $55,391 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Traffic Signal Upgrades | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $35,214 | N/A | Transportation Technology (e.g. ITS) | Project Complete | N/A |
Details | Burke Station Road Sidewalk | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $33,329 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Chain Bridge Road Sidewalk | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $32,823 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Railroad Avenue Sidewalk | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $19,515 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Old Town Traffic Study | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $14,841 | N/A | Other | Project Complete | N/A |
Details | Orchard Drive Sidewalk Design | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $14,775 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Orchard Street/CBR Intersection Evaluation | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $11,517 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Cobbdale Traffic Calming | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $9,107 | N/A | Roadway | Project Complete | N/A |
Details | University Drive Road Diet | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $48,262 | N/A | Roadway | Project Complete | N/A |
Details | Mason to Metro Bike Route | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $13,884 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | University Drive Extension | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $6,211 | N/A | Roadway | Project Complete | N/A |
Details | Fairfax Boulevard Sidewalk Improvements | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $715 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Pickett Trail Connector | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $37,559 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Warwick/Fairfax Blvd | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $78,751 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | University Drive Traffic Calming | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $407,327 | N/A | Roadway | Project Complete | N/A |
Details | Transportation Project Evaluation for Smart Scale Applications | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $770,334 | N/A | Other | Project Underway | N/A |
Details | Downtown Electronic Parking Signage | City of Fairfax | City of Fairfax | N/A | City of Fairfax | 0 | $170 | N/A | Other | Project Complete | N/A |
Details | WMATA Subsidy (Citywide) | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $3,315,385 | N/A | Rail | Project Underway | N/A |
Details | Funds Match DRPT Bus Shelter (Route 7, various locations) | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $220,772 | N/A | Bus | Project Complete | N/A |
Details | Bikeshare Connections to Metro (Citywide) | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $51,709 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Downtown Area Pre-scoping | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $60,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Walter Mess Plaza | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $40,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | N Wash & Columbia Signal & Intersection Improvements | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $344,516 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | N West & Great Falls Signal | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $3,126 | N/A | Transportation Technology (e.g. ITS) | Project Complete | N/A |
Details | Infrastructure Programs - Signals- S Maple Ave and W Annandale Rd Signal | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $930,625 | N/A | Transportation Technology (e.g. ITS) | Project Underway | N/A |
Details | Transportation Program Management (DRPT match) | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $16,000 | N/A | Other | Project Complete | N/A |
Details | NVTA Expense (Annual) | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $50,573 | N/A | Other | Project Underway | N/A |
Details | Broad Street Ped Crossing | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $190,603 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | W&OD Trail Crossings | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $200,175 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | N West Pedestrian Improvements | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $101,397 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Veterans Commons Park | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $60,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | South Washington POA - Maple Ave & S Wash Intersection | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $523,228 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | South Washington POA - S Wash & Annandale Intersection | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $412,500 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Neighborhood Traffic Calming | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $300,000 | N/A | Roadway | Project Underway | N/A |
Details | Berman Park | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $8,291 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Streetlight LED Conversion | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $263,000 | N/A | Transportation Technology (e.g. ITS) | Project Underway | N/A |
Details | BikeShare Founders Row | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $47,224 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Transportation Project Development | City of Falls Church | City of Falls Church | N/A | City of Falls Church | 0 | $300,000 | N/A | Other | Project Underway | N/A |
Details | Prince William St (Grant Ave to Wellington Rd) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $1,659,000 | N/A | Roadway | Project Complete | N/A |
Details | Dean Dr Extended (Route 28 to existing Dean Drive) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $2,769,000 | N/A | Roadway | Project Complete | N/A |
Details | Battle St (Portner Street to Quarry Road) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $381,646 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Grant Avenue (Lee Avenue to Wellington Rd) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $900,000 | N/A | Roadway | Project Underway | N/A |
Details | Sidewalk & Bicycle Infill Initiatives (Citywide) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $2,485,700 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Centerville Road Improvements (Liberia Ave to City Limits) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $803,687 | N/A | Roadway | Project Complete | N/A |
Details | Grant Avenue Pedestrian Improvements (at Center Street) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $22,680 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Godwin Drive Bike Trail (Wellington Road to Hastings Drive) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $900,000 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Transportation Master Plan (Citywide) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $175,000 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Commercial Corridor streetscape: Mathis Streetscape from Sudley Road to Liberia Ave. (Planning); West Street sidewalk extension; Liberia Ave/Route 28 intersection pedestrian improvements | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $667,000 | N/A | Roadway | Project Complete | N/A |
Details | Traffic Signal Coord & Upgrades (Citywide) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $1,000,000 | N/A | Transportation Technology (e.g. ITS) | Project Underway | N/A |
Details | Mathis Avenue (Sudley Road to Liberia Avenue) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $2,097,000 | N/A | Roadway | Project Underway | N/A |
Details | Wellington Road Shared-Use Path Gap (Nokesville Road to Prince William Street) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $482,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Vehicular Wayfinding (Citywide) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $220,000 | N/A | Roadway | Project Complete | N/A |
Details | Project Development (Citywide) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $700,000 | N/A | Other | Project Underway | N/A |
Details | Longstreet Sidewalk | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $1,750,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Dumfries Road Sidewalk Infill (Milic St. to Hastings Dr.) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $230,000 | N/A | Pedestrian only | Project Underway | N/A |
Details | Sudley Sidewalk (Grant Ave. to Mathis Ave.) | City of Manassas | City of Manassas | N/A | City of Manassas | 0 | $485,000 | N/A | Pedestrian only | Project Underway | N/A |
Details | Conner Drive Extension | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $992,976 | N/A | Roadway | Project Complete | N/A |
Details | Moseby Drive Culvert Replacement | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $614,132 | N/A | Roadway | Project Complete | N/A |
Details | Street Resurfacing | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $1,733,988 | N/A | Roadway | Project Underway | N/A |
Details | Sidewalk, Curb & Gutter, and Asphalt Repairs | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $562,597 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Moseby Emergency Repairs | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $32,733 | N/A | Roadway | Project Complete | N/A |
Details | Upper Kent Drive Reconstruction | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $357,252 | N/A | Roadway | Project Complete | N/A |
Details | Traffic Signal Upgrades | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $11,500 | N/A | Transportation Technology (e.g. ITS) | Project Complete | N/A |
Details | Manassas Drive Russia Branch Culvert Replacement | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $432,151 | N/A | Roadway | Project Complete | N/A |
Details | Additional Streets Projects (concrete repair and paving) | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $48,572 | N/A | Roadway | Project Underway | N/A |
Details | Culvert Upgrade at Manassas Drive - Public Works Office | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $49,842 | N/A | Roadway | Project Complete | N/A |
Details | Manassas Drive Traffic Study | City of Manassas Park | City of Manassas Park | N/A | City of Manassas Park | 0 | $54,656 | N/A | Roadway | Project Underway | N/A |
Details | Van Buren Street Improvements (Old Spring Street to Herndon Parkway) | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $1,778,000 | N/A | Roadway | Project Complete | N/A |
Details | Elden St and Center St Intersection Improvements | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $850,000 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Elden St and Monroe St Intersection Improvements | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $977,000 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Park Ave & Monroe St Intersection Improvements | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $450,000 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Trails to Herndon Metrorail (Herndon Pkwy/Van Buren St to Metrorail) | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $415,000 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Worldgate Drive Extension | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $150,000 | N/A | Roadway | Project Underway | N/A |
Details | Park Avenue sidewalks (sidewalk extension of Park Ave. and Monroe St. project) | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $100,000 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Widen East Spring Street (Herndon Parkway to Town limits)/with Herndon Parkway cycle track | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $968,000 | N/A | Roadway | Project Underway | N/A |
Details | Traffic Signal Uninterruptable Power Supply (UPS) for Town Arterial Roadways | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $350,000 | N/A | Transportation Technology (e.g. ITS) | Project Complete | N/A |
Details | Sterling Road Improvements (Elden Street to Town Limits) | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $204,000 | N/A | Roadway | Project Underway | N/A |
Details | Herndon Metrorail Station Transit Related Growth Study | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $154,000 | N/A | Other | Project Underway | N/A |
Details | Herndon Parkway Intersection Improvements at Sunset Business Park Drive | Town of Herndon | Town of Herndon | N/A | Town of Herndon | 0 | $1,500,000 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Evergreen Mill Rd Widening (Leesburg S Corporate Limits to S King St) | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $6,299,000 | N/A | Roadway | Project Underway | N/A |
Details | Sycolin Rd Widening Phase IV (Leesburg S Corporate Limits to Tolbert Ln) | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $2,186,770 | N/A | Roadway | Project Complete | N/A |
Details | Morven Park Rd Sidewalk | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $4,638,200 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | West Market St Sidewalk (Morven Park Rd to Ayr St) | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $1,664,000 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Traffic Management System/Emergency Evacuation System (Townwide) | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $521,347 | N/A | Transportation Technology (e.g. ITS) | Project Complete | N/A |
Details | Battlefield Parkway (S King St to Dulles Greenway) | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $701,000 | N/A | Roadway | Project Complete | N/A |
Details | Edwards Ferry Road Sidewalk, Bus Shelters & Bus Route Signs | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $104,444 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Edwards Ferry Road NE Sidewalk Improvements | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $1,818,933 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Catoctin Circle Turn Lane and Trail | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $51,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Plaza Street Sidewalk | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $73,810 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Royal Street Improvements - Church Street to Wirt Street | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $1,097,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Market Street/King Street Intersection Improvements | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $2,279,297 | N/A | Roadway | Project Underway | N/A |
Details | Traffic Signal - Sycolin Rd & Gateway Dr | Town of Leesburg | Town of Leesburg | N/A | Town of Leesburg | 0 | $140,000 | N/A | Transportation Technology (e.g. ITS) | Project Underway | N/A |
Details | Nursery Ave Improvements | Town of Purcellville | Town of Purcellville | N/A | Town of Purcellville | 0 | $909,244 | N/A | Roadway | Project Complete | N/A |
Details | 32nd & A Street Intersection Improvements | Town of Purcellville | Town of Purcellville | N/A | Town of Purcellville | 0 | $510,822 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Main & Maple Intersection Improvements, Phase 1 | Town of Purcellville | Town of Purcellville | N/A | Town of Purcellville | 0 | $648 | N/A | Intersection/Interchange | Project Complete | N/A |
Details | Main & Maple Intersection Improvements, Phase 2 | Town of Purcellville | Town of Purcellville | N/A | Town of Purcellville | 0 | $417,331 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | 12th Street Drainage & Roadway Improvements | Town of Purcellville | Town of Purcellville | N/A | Town of Purcellville | 0 | $385,243 | N/A | Roadway | Project Underway | N/A |
Details | 32nd & Main Street Intersection Improvements | Town of Purcellville | Town of Purcellville | N/A | Town of Purcellville | 0 | $171,702 | N/A | Intersection/Interchange | Project Underway | N/A |
Details | Hatcher Avenue Sidewalk Improvements | Town of Purcellville | Town of Purcellville | N/A | Town of Purcellville | 0 | $314,972 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | East Main Street Sidewalk Improvements | Town of Purcellville | Town of Purcellville | N/A | Town of Purcellville | 0 | $258,461 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | G Street Sidewalk Improvements | Town of Purcellville | Town of Purcellville | N/A | Town of Purcellville | 0 | $30,069 | N/A | Pedestrian only | Project Underway | N/A |
Details | Follin Lane SE Reconstruction (Echols St SE to Maple Ave) | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $1,512,695 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Marshall Road SW Sidewalk | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $699,655 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Church Street NE Sidewalk | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $221,871 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Park Street NE Sidewalk | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $368,621 | N/A | Bike and Pedestrian | Project Complete | N/A |
Details | Sidewalks to Metrorail - Kingsley Road Sidewalk | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $679,730 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Bikeshare Stations | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $272,400 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Orchard Street NW Sidewalk | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $200,000 | N/A | Bike and Pedestrian | Not Yet Started | N/A |
Details | Church St Sidewalk | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $600,000 | N/A | Bike and Pedestrian | Project Underway | N/A |
Details | Church Street and East Street | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $500,000 | N/A | Roadway | Project Underway | N/A |
Details | Nutley St (Rte 243) and Maple Ave (Rte 123) Signal Upgrades | Town of Vienna | Town of Vienna | N/A | Town of Vienna | 0 | $1,500,000 | N/A | Roadway | Project Underway | N/A |
Lane Miles Added
Project Funding Sources
NVTA provides funding for multi-modal transportation improvement projects across Northern Virginia
NVTA Funds Spent
NVTA reimburses funds periodically as the recipient entity spends the funds and submits satisfactory documentation.
Route 28 Widening: Prince William County Line to Route 29 (Project #10)
Regional and Local ProjectPROJECT DESCRIPTION
This project proposes to widen Route 28 from 4 to 6 lanes from the Prince William County line at Bull Run to Route 29 in Centreville. The project would include intersection improvements and pedestrian/bicycle facilities on both sides of the roadway and improvements to pedestrian/bicycle facilities at all intersections through the corridor.
Regional Revenues (70%)
Local Distribution Funds (30%)
Related Project Agreements
Agreement ID | Application Name | Project Description Form | Funds |
---|---|---|---|
2018-10-3 | Route 28 Widening: Prince William County Line to Rte 29 | $16,000,000.00 | |
2017-10-2 | Route 28 Widening: Prince William County Line to Route 29 | $5,000,000.00 | |
2015-10-1 | Route 28 Widening: Prince William County Line to Route 29 | $5,000,000.00 |